Free Local Deliver upto 30kg or Drop In! 0% Finance on Selected Martin Machines +130% Tax Allowance on Machinery

Hoffman

(96 Products)
Browse our range of Hoffman dovetail machines, dovetail keys, and jointers for your woodworking needs. With years of experience selling the very best industrial machinery, you can trust us to find the right Hoffman machine for your workshop.
View as Grid List

Items 1-48 of 96

Page
per page
Filter By
Set Descending Direction
  1. Hoffman CBM Glazing Bar Scribing Machine
    • Power supply 230V 50/60 Hz 0,5 kW
    • Motors 2 x 1050W
    • Motor Speed 5000 - 24000 rpm
    Lead Time: 9 Days
    £ Enquire
  2. Hoffman MU3 Manual Jointing machine
    W1031000 The new Hoffmann MU3 routing machine for dovetail joints (replaces the MU2) has many new standard features and a new erg...
    Lead Time: 9 Days
    £2,014.00
    £2,416.80
  3. Hoffman MU3P Pneumatic Jointing Machine
    • Electrical connection 230v single phase
    • Nominal power 0,45kw
    • Controls pneumatic
    Lead Time: 9 Days
    £2,808.00
    £3,369.60
  4. Hoffman PP2 jointing machine
    The Hoffmann PP2 dovetail routing machine is a free standing production unit. This model is equipped with two high-speed router mo...
    Lead Time: 9 Days
    £6,180.00
    £7,416.00
  5. Hoffman PU2 Dovetail Jointing Machine
    • Power Supply: 220 volts,
    • Max. routing height: 100 mm
    • Max. material height: 150 mm
    Lead Time: 9 Days
    £ Enquire
  6. Hoffmann  1000W / 230v UAG Router Motor
    1000W / 230v UAG Router Motor
    Lead Time: 9 Days
    £305.00
    £366.00
  7. Hoffmann  530W / 230v FM Router Motor
    530W / 230v FM Router Motor
    Lead Time: 9 Days
    £212.00
    £254.40
  8. Hoffmann  6mm / 6.35mm / 8mm Collet
    6mm / 6.35mm / 8mm Collet
    Lead Time: 9 Days
    £29.00
    £34.80
  9. Hoffmann  Butt-stop elevation
    Butt-stop elevation
    Lead Time: 9 Days
    £102.00
    £122.40
  10. Hoffmann  CBM End Profiler machine
    CBM End Profiler machine
    Lead Time: 9 Days
    £3,237.00
    £3,884.40
  11. Hoffmann  Centre fence adjustable, Synchro
    Centre fence adjustable, Synchro
    Lead Time: 9 Days
    £187.00
    £224.40
  12. Hoffmann  Cornice fences (SET)
    Cornice fences (SET)
    Lead Time: 9 Days
    £295.00
    £354.00
  13. Hoffmann  Digital positioning of the flip-stop
    Digital positioning of the flip-stop
    Lead Time: 9 Days
    £255.00
    £306.00
  14. Hoffmann  Digital positioning of the router positi
    Digital positioning of the router position & routi
    Lead Time: 9 Days
    £436.00
    £523.20
  15. Hoffmann  Escho Saw Blades for MS35 350 # 30 # 3.2
    Escho Saw Blades for MS35 350 # 30 # 3.2 (each)
    Lead Time: 9 Days
    £248.00
    £297.60
  16. Hoffmann  Fence guide extensions per 1000mm (SET)
    Fence guide extensions per 1000mm (SET)
    Lead Time: 9 Days
    £122.00
    £146.40
  17. Hoffmann  Flip-stop for extension fences
    Flip-stop for extension fences
    Lead Time: 9 Days
    £82.00
    £98.40
  18. Hoffmann  Flip-stop for machine rear fence
    Flip-stop for machine rear fence
    Lead Time: 9 Days
    £82.00
    £98.40
  19. Hoffmann  Flip-stop mini
    Flip-stop mini
    Lead Time: 9 Days
    £45.00
    £54.00
  20. Hoffmann  Internal fence elevation
    Internal fence elevation
    Lead Time: 9 Days
    £102.00
    £122.40
  21. Hoffmann  Internal fences (SET)
    Internal fences (SET)
    Lead Time: 9 Days
    £101.00
    £121.20
  22. Hoffmann  Internal fences, adjustable (SET)
    Internal fences, adjustable (SET)
    Lead Time: 9 Days
    £197.00
    £236.40
  23. Hoffmann  Laser line
    Laser line
    Lead Time: 9 Days
    £104.00
    £124.80
  24. Hoffmann  Left & Right Return Springs per set
    Left & Right Return Springs per set
    Lead Time: 9 Days
    £13.00
    £15.60
  25. Hoffmann  Magnifying lense (scale)
    Magnifying lense (scale)
    Lead Time: 9 Days
    £39.00
    £46.80
  26. Hoffmann  Motor - 500w MS35SF Angle Router UWC-24-
    Motor - 500w MS35SF Angle Router UWC-24-R
    Lead Time: 9 Days
    £493.00
    £591.60
  27. Hoffmann  MU / X line Elevation ONLY 45 Face plate
    MU / X line Elevation ONLY 45 Face plate (raised)
    Lead Time: 9 Days
    £102.00
    £122.40
  28. Hoffmann  MU 3-D  Manual Dovetail routing machine
    W1031100 Hoffmann MU 3-D Manual Dovetail routing machine Professional level, manually operated dovetail routing mach...
    Lead Time: 9 Days
    £2,426.00
    £2,911.20
  29. Hoffmann  MU2 Butt Stop
    MU2 Butt Stop
    Lead Time: 9 Days
    £49.00
    £58.80
  30. Hoffmann  MU3 Butt stop
    MU3 Butt stop
    Lead Time: 9 Days
    £49.00
    £58.80
  31. Hoffmann  MU3 Centre line gauge (MU2 W3900021A)
    MU3 Centre line gauge (MU2 W3900021A)
    Lead Time: 9 Days
    £53.00
    £63.60
  32. Hoffmann  Mullion fence
    Mullion fence
    Lead Time: 9 Days
    £198.00
    £237.60
  33. Hoffmann  Multi Digital gauge
    Multi Digital gauge
    Lead Time: 9 Days
    £83.00
    £99.60
  34. Hoffmann  Routing depth and lever limiter
    Routing depth and lever limiter
    Lead Time: 9 Days
    £52.00
    £62.40
  35. Hoffmann  Sliding fence
    Sliding fence
    Lead Time: 9 Days
    £294.00
    £352.80
  36. Hoffmann  Table extensions per 400mm (SET)
    Table extensions per 400mm (SET)
    Lead Time: 9 Days
    £208.00
    £249.60
  37. Hoffmann  W-0  10mm key
    Hoffmann W-0 10mm key original Hoffmann butterfly jointing key : box quantity 1000 keys
    Lead Time: 9 Days
    £37.00
    £44.40
  38. Hoffmann  W-0  22mm key
    Hoffmann W-0 22mm key original Hoffmann butterfly jointing key : box quantity 1000 keys
    Lead Time: 9 Days
    £47.00
    £56.40
  39. Hoffmann  W-0  35mm key
    Hoffmann W-0 35mm key original Hoffmann butterfly jointing key : box quantity 1000 keys
    Lead Time: 9 Days
    £52.00
    £62.40
  40. Hoffmann  W-3  15.8mm key
    Hoffmann W-3 15.8mm key original Hoffmann butterfly jointing key : box quantity 1000 keys
    Lead Time: 9 Days
    £80.00
    £96.00
  41. Hoffmann  W-3  17.5mm key
    Hoffmann W-3 17.5mm key original Hoffmann butterfly jointing key : box quantity 1000 keys
    Lead Time: 9 Days
    £84.00
    £100.80
  42. Hoffmann  W1 Tungsten Router Cutter 6mm
    W1 Tungsten Router Cutter 6mm
    Lead Time: 9 Days
    £48.00
    £57.60
  43. Hoffmann  W1 Tungsten Router Cutter 6mm S/L
    W1 Tungsten Router Cutter 6mm S/L
    Lead Time: 9 Days
    £53.00
    £63.60
  44. Hoffmann  W2 Tungsten Router Cutter 6mm
    W2 Tungsten Router Cutter 6mm
    Lead Time: 9 Days
    £48.00
    £57.60
  45. Hoffmann  W2 Tungsten Router Cutter 6mm S/L
    W2 Tungsten Router Cutter 6mm S/L
    Lead Time: 9 Days
    £53.00
    £63.60
  46. Hoffmann  W3 Tungsten Router Cutter 6mm
    W3 Tungsten Router Cutter 6mm
    Lead Time: 9 Days
    £52.00
    £62.40
  47. Hoffmann  W3 Tungsten Router Cutter 6mm S/L
    W3 Tungsten Router Cutter 6mm S/L
    Lead Time: 9 Days
    £54.00
    £64.80
  48. Hoffmann  W4 Tungsten Router Cutter 8mm
    W4 Tungsten Router Cutter 8mm
    Lead Time: 9 Days
    £96.00
    £115.20
View as Grid List

Items 1-48 of 96

Page
per page
Filter By
Set Descending Direction